This project took place in a strip mall, which presented unique challenges due to the confined area in which we could work. Our team of experts completed this project safely and on time.
- The objective of this excavation project was to break out the existing concrete floor and excavate all sub-grade material to a depth of four feet.
- All excavated material was hauled off site as non-hazardous special waste.
- 1,088 cubic yards of material was excavated and replaced with more than 1,000 tons of three inch stone and 400 tons of three-quarter inch stone.
- This project was completed in nine working days with the use of two skid-steers and a mini-backhoe.